Skip to content
Live
Brighton seafront — pebble beach and promenade looking along the coast
© Mat Fascione / Geograph CC BY-SA 2.0 / CC BY-SA 2.0

Restoration of Brighton's Historic Madeira Terrace Moves Forward

New photographs show the ongoing restoration work on one of the world's longest cast iron structures along Brighton seafront.

Brighton & Hove Editorial15 June 2026

A Landmark Taking Shape

Aerial photographs have captured the exciting progress being made on the restoration of Madeira Terrace, one of Brighton's most cherished seafront landmarks. Brighton and Hove City Council has been working hard to breathe new life into this historic structure, which stretches nearly three thousand feet along the promenade.

Scale of the Project

The restoration project focuses on 28 of the terrace's distinctive arches, specifically those located between the Royal Crescent steps and Concorde 2. Alongside arch restoration, the work includes the installation of a brand new lift and a complete replacement of the upper deck, ensuring the structure is safe and accessible for generations to come.

Madeira Terrace holds a special place in both local and architectural history. Running to an impressive length of nearly three thousand feet, it is the longest continuous cast iron structure in the UK and, by some estimations, the longest in the world. This remarkable engineering feat makes it a treasure worth protecting and preserving.

Building Progress

Construction began at the site in November 2024, marking the start of what the council describes as one of its major heritage projects. The ongoing work demonstrates a real commitment to maintaining Brighton's architectural heritage whilst ensuring the terrace remains a safe and welcoming space for residents and visitors alike.

The restoration effort reflects the value our community places on its historic assets. Madeira Terrace has been a focal point of Brighton seafront for generations, and this comprehensive restoration will ensure it continues to be enjoyed for many more to come.

Looking Forward

The photographs documenting this restoration work provide a glimpse into the meticulous process of preserving such a significant structure. Each stage of the project shows the dedication and craftsmanship involved in restoring the terrace to its former glory while meeting modern safety and accessibility standards.

As the work continues, Brighton residents and visitors can look forward to seeing this iconic structure fully restored. The project represents an investment in our city's past and its future, ensuring that Madeira Terrace remains a distinctive and cherished part of our seafront for years to come.

Source: Pictures show progress of project to restore one of world's longest structures

Madeira TerraceHeritageBrighton SeafrontRestoration